Start with the actual parking stalls

Create a simple list or plan of the parking stalls that the strata wants to consider. Note where each stall is located, how the stalls are arranged and whether the proposed charging areas are in a parkade, outdoor lot or another part of the property. Include any known limits on access, common areas, gates or shared routes. The goal is to understand the real distance and pathway between potential charging locations and the building’s electrical distribution. A general stall count is helpful, but it does not replace looking at how the stalls are physically laid out.

Gather the electrical information already available

Collect electrical drawings, maintenance records, previous project information and any available details about the building’s electrical distribution. If the strata does not have complete records, that is not a reason to delay the first conversation. Tell PTX what is available and what is missing. PTX can review the available information alongside site conditions. The planning discussion may consider electrical capacity, distribution, load management and where charging equipment could be located. A specific recommendation still requires an assessment of the property rather than assumptions based on a document or a generic article.

Record pathways, access and phasing questions

Ask the strata council or property manager to note where wiring or other electrical infrastructure might need to travel, while avoiding assumptions about what can be installed. Include practical information about access to electrical rooms, parkade areas and parking levels, as well as any planned renovations or maintenance that could affect phasing. It is also useful to decide what the strata is trying to plan for: a staged approach, broader future charging access or an initial group of stalls. An EVEMS may be part of the discussion where load management is relevant, but the appropriate approach depends on the property’s conditions and the actual project requirements.

EV charging at a Vancouver housing co-op

Confirm the project questions before choosing a scope

Bring the parking information, available records and council’s goals into an EV Ready Plan discussion. PTX can help identify what needs to be reviewed, document practical electrical considerations and explain which decisions require further information. Where professional design or assurance is required, PTX leads the practical electrical work and coordinates engineering as needed. Permit, utility and other authority requirements must be confirmed for the actual project when applicable. The next decision may be to gather missing site information, proceed with a site assessment or refine the intended phasing. That decision should follow the evidence available for the property, not a promised equipment choice, price or outcome.

Frequently asked questions

Questions property decision-makers ask

Does a strata need complete drawings before contacting PTX?

No. Drawings and maintenance records are useful when available, but they are not required for the first conversation. Share what the strata has and identify what is missing so the information can be assessed properly.

What should the parking-stall list include?

Include the locations of the stalls being considered, how they are arranged and any known access or pathway limitations. The list should help connect the real parking areas with the building’s electrical distribution.