Strata corporations with five or more lots
The provincial requirement generally applies to strata corporations with at least five strata lots, including many condominium, townhouse and bare-land strata properties.
Electrical Planning Reports for strata
Most B.C. strata corporations with five or more lots must obtain an Electrical Planning Report. PTX helps councils and property managers organize the property information, electrical field work and qualified-provider coordination needed for an accurate report, then connects its findings to practical implementation.

01
The provincial requirement generally applies to strata corporations with at least five strata lots, including many condominium, townhouse and bare-land strata properties.
Existing strata corporations in Metro Vancouver, the Fraser Valley Regional District and the Capital Regional District generally require an EPR by December 31, 2026, with specified air- or boat-access island exceptions.
Existing strata corporations in other areas of British Columbia generally require an EPR by December 31, 2028. New strata corporations generally have five years from deposit of the strata plan, while phased stratas have specific timing rules.
The completed EPR is kept permanently by the strata corporation and may be disclosed through a Form B Information Certificate, so clarity and accuracy matter beyond the compliance date.
02
The report describes the capacity of the strata corporation's electrical system and the available information used to understand it.
It lists existing demands and estimates peak demand and spare capacity rather than assuming unused breaker space equals available building capacity.
The provider estimates future demand associated with priorities such as EV charging, heat pumps, ventilation, cooling and other anticipated electrical loads.
Recommendations may identify ways to reduce or manage demand, including efficient lighting, controls or load-management strategies that help the property remain within available capacity.
03
The provincial guidance describes an EPR as a high-level overview. It does not provide the project-specific analysis required to install new loads or alter the electrical system.
An EPR considers overall capacity and future demand. An EV Ready Plan develops the detailed building-wide strategy for providing EV charging capability to parking stalls.
New EV charging, heat pumps, service changes and other added loads require project-specific capacity confirmation, equipment selection and any necessary permits, utility or engineering work.
Where useful, EPR field work can be coordinated with an EV Ready Plan, lighting review or broader electrical assessment to reduce duplicated investigation while keeping each deliverable distinct.
04
Eligible professional engineers, professional licensees engineering, applied science technologists and certified technicians can prepare EPRs for Part 3 or Part 9 buildings when they meet the provincial designation requirements.
A construction or industrial electrician who meets the provincial journeyperson definition may prepare an EPR only for qualifying Part 9 buildings.
Part 3 buildings are generally larger or more complex; Part 9 covers qualifying housing and small buildings. A local government can help confirm classification when the strata is unsure.
PTX helps establish the property and provider path, contributes electrical site information and practical implementation context, and coordinates an engineer, technologist or other designated professional when required.
05
Confirm the strata plan, lot and parking counts, building type, available drawings, utility information, known electrical systems and the council's expected future loads.
Review available documents and accessible service, distribution and major connected equipment so the provider has a dependable starting point.
Confirm the designated provider appropriate to the building and support the assessment, questions and site access required to complete the regulated deliverable.
Use the report to organize capacity questions, EV planning, lighting and demand management, equipment renewal and project-specific investigation into realistic priorities.
Questions
The provincial requirement generally applies to strata corporations with five or more lots. Location, strata age, phasing and rare independently supplied configurations affect the required report and timing.
Existing strata corporations in Metro Vancouver and the Fraser Valley Regional District generally require an EPR by December 31, 2026, subject to the provincial exceptions and phased-strata rules.
No. An EPR is a high-level overview and cannot by itself inform installation of added electrical loads. A qualified project-specific review must confirm equipment, capacity and required upgrades.
No. The EPR addresses overall electrical capacity and future demand. An EV Ready Plan details the building-wide strategy for EV charging infrastructure. The investigations may be coordinated, but the documents remain distinct.
That depends on the building classification and the credentials required by provincial regulation. PTX confirms the appropriate provider path, completes work within eligible scope and coordinates another designated professional where required.
Useful starting information includes the strata plan, building and parking counts, available single-line drawings, utility records, major electrical equipment, current EV charging and the council's anticipated future electrical priorities.
Start with useful information
For planned work, send the address, access context and safe photographs. For an urgent electrical safety concern, call the 24-hour emergency phone line.