Documented field work
Installation details and completed work



The need
The recorded work began with electrical connections for an existing sign. The sign fitter was not on site, so the sign itself was not easily removable and the new signs still needed to be confirmed when fitted. The job also identified an outlet in the bar area with an unsecured open-back 4x4 box. The box and cable position were interfering with the cooler.
PTX's approach
PTX reviewed the existing sign cables and worked on the outlet enclosure. The outlet was removed, the cables were fed through behind the panel, and a hole was drilled so the cables could enter the rear of the box. New outlets and a cover plate were fitted. On November 5, PTX reviewed the sign connections and found them safely enclosed in a metal junction box.
The recorded result
The job record shows the outlet area received new outlets and a cover plate, with the cables routed behind the panel rather than obstructing the cooler. It also records the sign connections as safely enclosed in a metal junction box. The record does not say that new signs were installed; their confirmation was still required when fitted.
What this job helps another property owner consider
When electrical work supports a sign installation, the sign fitter's timing and the condition of the existing connections both matter. This job also shows the value of checking whether an outlet box is properly enclosed and whether cable routing affects nearby equipment. Any recommendation should be based on the actual wiring and enclosure found on site.
Frequently asked questions
Questions property decision-makers ask
Did PTX install the new signs on this Vancouver job?
The record does not confirm that new signs were installed. It states that the sign fitter was not on site and that the new signs still needed to be confirmed when fitted. PTX did review the existing sign connections and found them safely enclosed in a metal junction box.