Documented field work

Installation details and completed work

Gray electrical breaker panel with multiple circuit breakers, surrounding wiring, and a manufacturer label visible on the front.
detailCompleted electrical panel work with organized wiring and circuit breakers.
Open electrical service panel showing circuit breakers, bundled conductors, grounding and neutral terminals, and conduit in a framed utility space.
detailElectrical panel wiring and circuit breakers shown after service work.
Open metal electrical junction box containing red, black, white, and copper wires, wire connectors, and a central two-pole component.
detailElectrical wiring and components arranged inside a metal junction box.

The need

The recorded request was to disconnect the electrical supply to a sauna. No additional customer details, cause or equipment information was recorded, so this story stays focused on the documented service task.

PTX's approach

PTX completed the approved fixed-price scope for the electrical disconnect. The job record also identifies a 22 to 8 AWG Blue Ideal Marrette Single under the electrical service details. No work beyond the recorded sauna disconnect is described here.

The recorded result

The approved scope was recorded as completed on October 23, 2026. The job record describes the completed work as disconnecting the electrical to the sauna. Four detail photos were selected for the record; there were no people, before photos or after photos in the selected set.

What this job helps another property owner consider

If a sauna is no longer intended to be used, the electrical disconnect should be described clearly when requesting an electrical service call. This documented Vancouver job shows a focused scope: the recorded work was to disconnect the electrical to the sauna, rather than assume that other electrical work was required.

Frequently asked questions

Questions property decision-makers ask

What was completed during this Vancouver electrical service call?

The approved fixed-price scope was to disconnect the electrical to the sauna, and the job record states that this scope was completed on October 23, 2026.