Documented field work

Installation details and completed work

A red-and-black electrical power backup unit with connected cabling is shown installed beside an electrical enclosure.
afterInstalled backup power equipment with connected electrical cabling.
Close-up of a red-and-gray electrical power unit with thick red and black cables connected inside an equipment enclosure.
afterCompleted installation of an electrical power unit and connected cabling.
Two gray Siemens electrical disconnect enclosures are mounted vertically on a wall, connected by metal conduit, with a nearby wall switch and a label identifying a forklift charger
detailCompleted installation of Siemens electrical disconnects and conduit for a forklift charger.
Installed Siemens industrial-duty switch and maintenance forklift charger mounted in an equipment area with conduit connections.
detailCompleted installation of an industrial forklift charger and disconnect equipment.

The need

The site needed two existing forklift chargers replaced with new forklift chargers. The documented work focused on disconnecting the two power cords from the old chargers and connecting them to the new equipment.

PTX's approach

PTX disconnected both power cords from the old forklift chargers and installed them on the new forklift chargers. The new chargers were then tested with a Motive Energy representative to check that they were working properly.

The recorded result

The two new forklift chargers were installed and tested with the Motive Energy representative. This electrical service call was completed on August 27, 2026.

What this job helps another property owner consider

When replacing powered equipment, plan for both the electrical connection and a coordinated check with the equipment specialist. In this case, testing was carried out with a Motive Energy representative after the two power cords were installed on the new forklift chargers.

Frequently asked questions

Questions property decision-makers ask

What did PTX do during this forklift charger installation?

PTX disconnected two power cords from the old forklift chargers, installed them on the new forklift chargers and tested the new chargers with a Motive Energy representative.

Related PTX services