Documented field work
Installation details and completed work


The need
The property had large and smaller holes in the asphalt, including potholes along the main drive aisle. The recorded scope was to repair the worst areas rather than describe the work as a broader resurfacing project.
PTX's approach
PTX first assessed the situation, then picked up the material needed for the repair. The work used cold repair asphalt and focused on the worst potholes along the drive aisle. This kept the recorded work tied to the specific asphalt repairs identified at the property.
The recorded result
The job record states that the four worst potholes in the main drive aisle were repaired, followed by repairs to the worst holes along the drive aisle using eight more pails of cold repair asphalt. The recorded completion date is October 26, 2026. The available photos are detail images, so they are not used here to claim a before-and-after result or any testing outcome.
What this job helps another property owner consider
If a property has several asphalt holes, it can help to identify which areas are in the worst condition and discuss whether the repair should focus on those areas first. This job records an assessment followed by targeted cold asphalt repairs; it does not diagnose conditions at another property or promise the same result.
Frequently asked questions
Questions property decision-makers ask
What type of property repairs were recorded for this North Vancouver job?
The recorded work was asphalt repair. PTX assessed the area and repaired the worst potholes along the main drive aisle with cold repair asphalt.