Documented field work
Installation details and completed work




The need
The recorded scope called for electrical reinstatement in two areas of the property: the laundry and an upstairs bathroom. The work included lighting, an under-cabinet light, floor-heating cables and thermostats.
PTX's approach
PTX worked through the listed reinstatement tasks directly. In the laundry, the under-cabinet light was secured, ceiling lights and the pantry light were refitted, and the floor-heating cable was fished from the floor to its thermostat. The same cable-to-thermostat work was completed in the upstairs bathroom, with both thermostats refitted and their time settings set.
The recorded result
The invoiced work records the reinstatement of the listed laundry and upstairs bathroom electrical items. This included secured and refitted lighting, floor-heating cables connected to thermostats, and thermostats refitted with their time settings set. The evidence does not state additional testing or a wider restoration outcome.
What this job helps another property owner consider
When electrical items need to be reinstated during restoration work, it helps to identify each room and component clearly: lighting, heating cable and thermostat work may be separate tasks. A written scope can make it easier to track what has been refitted and what remains for a later stage.
Frequently asked questions
Questions property decision-makers ask
What electrical work was recorded for the upstairs bathroom?
The recorded work says the floor-heating cable was fished from the floor to the thermostat, and the thermostat was refitted with its time setting set. It does not record additional testing or a broader bathroom renovation.