Documented field work
Before, rebuild and recorded result












The need
The property required practical ventilation and lighting work. The recorded scope called for a booster fan serving the server-room exhaust, with ducting changes intended to reduce backpressure and avoid alarms. The gym also needed new light fixtures, while six garage bulbs were recorded as burnt out.
PTX's approach
The team installed the customer-supplied booster fan, adapted and sealed the ductwork, and later replaced a five-inch pipe with a six-inch insulated section. Spring-loaded hinges were added to the laundry-room door so it would stay closed while the ventilation arrangement drew air from the outside grille. For the gym, the team removed two existing fixtures, marked the new locations, installed octagonal boxes and new fixtures, and cleaned up after the work. Six garage bulbs were also replaced.
The recorded result
The new ducting was installed and insulated, and the soft vent was tested. The recorded temperature observations included 31°C at the soft vent, 20°C at the grille leading into the closet and 11°C at the laundry-room fresh-air grille during the test. The gym light was tested as working properly during installation. Two blank covers were left in place, with drywall repair and paint touch-up around the old fixtures identified for a separate carpentry job. Those finishing repairs are not described here as complete.
What this job helps another property owner consider
When a property repair involves ventilation and lighting together, it helps to separate the work into specific scopes and record what remains for another trade. This job shows the value of documenting ducting changes, door adjustments, lighting installation and any unfinished drywall or paint work rather than treating every part of a multi-scope visit as the same completed task.
Frequently asked questions
Questions property decision-makers ask
What property repairs were recorded as completed on this Burnaby project?
The records describe installation of a customer-supplied booster fan, adapted and sealed ductwork, a larger insulated pipe, spring-loaded laundry-room door hinges, six replacement garage bulbs and gym lighting work. The gym light was tested as working properly during installation.
Was all of the gym finishing work complete?
No. The lighting installation was recorded, but drywall repair and paint touch-up around the old gym fixtures were identified for a separate carpentry job. This story does not treat that finishing work as complete.