Documented field work
Installation details and completed work




The need
The recorded work involved water-damaged breakers in a breaker panel, including the main breaker. PTX attended for an emergency inspection, documented the condition with pictures and notes, and made the installation safe while the panel and its components were assessed.
PTX's approach
The damaged breakers were removed and the panel internals were checked for water damage. No obvious damage was found inside the panel. An insulation test was performed, with all recorded readings above 4000 MΩ at 1 kV. New breakers were then fitted, and the wires were trimmed and re-terminated.
The recorded result
The panel was declared safe to use in the job record. After the new breakers were fitted, power was restored and tested. The emergency inspection and repair work were completed on October 26, 2026.
What this job helps another property owner consider
When water affects breakers, the useful decision may involve more than replacing visible parts. This job included checking the panel internals and recording insulation-test results before the new breakers were fitted, providing a documented basis for restoring power.
Frequently asked questions
Questions property decision-makers ask
What was included in this Burnaby emergency response?
The recorded work included an inspection, photographs and notes for the report, removal of water-damaged breakers including the main breaker, an internal panel check, insulation testing, new breaker installation, wire re-termination and tested power restoration.