Documented field work
Installation details and completed work




The need
The recorded scope was electrical work for a heat pump installation. The work required a route for the wiring, a connection at the panel and heat pump, and a means of disconnecting the heat pump circuit.
PTX's approach
PTX measured the wire, collected the required materials and routed the wiring through the duct area. The cable was pulled and fastened with straps to the heat pump area, with penetrations drilled through the sill and wall. PTX installed the disconnect, connected the 30-amp breaker at the panel, terminated the wires in the disconnect and heat pump, and labelled the heat pump circuit and panel legend. Duct seal was placed at the wall penetration and behind the air-conditioning disconnect. A permit request was submitted and an inspection was requested with the inspector and homeowner.
The recorded result
The recorded work includes the electrical connection for the heat pump: routed and secured wiring, an installed disconnect, a connected 30-amp breaker, terminated wires and updated circuit labelling. The available record does not state that the permit was approved or that the requested inspection was completed.
What this job helps another property owner consider
When planning electrical work for a heat pump, it is worth asking how the wiring will be routed and secured, where the disconnect will be located, how the circuit will be identified at the panel, and what permit or inspection steps apply. This job included those wiring, disconnect, labelling and permit-request details, but it does not establish the requirements or outcome for another property.
Frequently asked questions
Questions property decision-makers ask
What electrical work was recorded for this Burnaby heat pump installation?
The record describes wiring routed and secured to the heat pump area, a disconnect installation, a connected 30-amp breaker, wire terminations at the disconnect and heat pump, sealed penetrations and updated circuit labelling.
