Documented field work
Before, rebuild and recorded result



The need
The service call addressed two recorded issues: one broken switch and one broken door chime. The work order identified a 15A Decora switch and a door chime in the scope.
PTX's approach
PTX Electric disconnected and removed the broken switch, then installed one new switch. The same process was recorded for the door chime: the broken unit was disconnected and removed, and one new door chime was installed.
The recorded result
The work order records the switch and door chime replacement as completed on October 5, 2026. No additional outcome is recorded in the supplied evidence.
What this job helps another property owner consider
When arranging an electrical service call, it helps to describe which fixtures are affected and what they are intended to do. In this documented New Westminster job, identifying the broken switch and door chime supported a specific replacement scope rather than an unspecified electrical repair.
Frequently asked questions
Questions property decision-makers ask
What was replaced during this New Westminster electrical service call?
The recorded scope lists one broken switch and one broken door chime. Both were disconnected and removed, and one new replacement was installed for each.
